1. Daily Safety Controls & Site Opening Checklist
Prior to admitting children each morning, staff complete the compulsory Daily Opening Safety Checklist (Annex P1) to verify that all indoor and outdoor learning zones meet strict safety benchmarks:
- Clear Escape Routes: Verification that all exit corridors, doors, and stairways are unlocked, unobstructed, and free of storage boxes or prams.
- Hazard Elimination: Daily inspection of floor surfaces, wall fixtures, electrical sockets, play equipment, and soft-play surfaces.
- Sanitation Verification: Checking that washrooms, changing stations, soap dispensers, and disposable paper towels are fully stocked and sanitized.
- Signage Inspection: Illuminated emergency exit signs, fire action notices, and emergency assembly points are checked for complete visibility.
Al Nahda Nursery